Evonik Industries' Future Strategic Plan for Silica Business (2024-2028)
Ngokwecebo elisha lenkampani i-Evonik kanye nekhanda lobuchwepheshe, umnyango wayo we-silica uzogxila ezinsikeni ezine zamasu eminyakeni emihlanu ezayo, esekelwa ngamathargethisi anenani kanye nezincazelo zobuchwepheshe:
- Global Capacity Reconfiguration
Ongoing Projects
- Louisiana Plant Expansion, USA (Operational by Q3 2025):
- New 25,000-ton hydrophilic fumed silica (AEROSIL®) production line
- Ihluzi ye-ammonia ehlanganisiwe (ukusebenza kukhuphukile ku-92%)
- Gujarat Complex, India (Total investment: €370 million):
- Hybrid precipitated/fumed silica platform with phased commissioning
- Phase 1 (2026): 40,000-ton HDS (Highly Dispersible Silica) capacity for premium tires
Supply Chain Optimization
- Regionalized "Hub-Spoke" network:
- APAC logistics hub in Singapore; South American hub in Brazil
- Target: Reduce APAC delivery lead time to 48 hours by 2026 (vs. current 72 hours)
- High-Value Product Portfolio Expansion
Electronics-Grade Development Pipeline
Product Code | Ubuchwepheshe BezeMisebenzi | Ukuthuthukiswa Kwesigaba | Target Market |
AEROXIDE E900 | Metal impurities ≤0.1 ppm; particle size CV ≤10% | Pilot testing (Q4 2024) | 3nm chip encapsulation |
SILFOAM HPC18 | Multi-level pore structure (micro/mesoporous) | Demo line construction (Q2 2025) | Next-gen silicon anode binders |
Healthcare Innovations
- Controlled-Release Carriers:
- BET surface area: 350–400 m²/g
- pH-responsive drug release (deviation <5%)
- 框架供应协议与诺华(2026生效)
- Carbon-Neutral Manufacturing Implementation
Process Innovation
- GreenHydro Return Initiative:
- Bio-Based Silicon Sourcing:
Digital Carbon Management
- ProcessAI™ real-time energy optimization:
- 8% ukwanda kokusebenza kokushisa emishinini ye-pyrolysis
- Steam consumption reduced to 2.9 tons/ton product (industry avg.: 3.5 tons)
- Blockchain-enabled carbon footprint tracking per ton shipped (2025 rollout)
- Uhlelo-Lwenziwe Ngemisebenzi Lokuthuthukiswa kwe-Ecosystem
Tire Industry Strategic Partnerships
- Co-development of "All-Climate 2050 Tire" with Bridgestone:
- Iphasi ye-transition silica composite (iphathenthi elindelekile)
- 35% ukwethemba okuthuthukisiwe (ASTM F2508 iqinisekisiwe)
- Izixazululo Zedijithali:
New Energy Market Entry
- Solid-State Electrolyte Additives:
- PV Encapsulation Films:
Financial Resource Allocation (2024–2028)
Investment Area | Isikhwama semali | Focus |
R&D | €1.2 billion | Electronics purification; bio-manufacturing |
Smart Manufacturing | €800 million | Full automation at India site |
Strategic M&A Fund | €500 million | SNP Materials (South Korea, carbon-silica composites) yohlozokwe. |
-Excludes potential greenfield CAPEX*
Risk Mitigation Framework
- Critical Material Security:
10-year metallurgical silicon supply agreement with Elkem (min. 60,000 tons/yr)
3-month stockpile of electronic-grade SiCl₄ in Malaysia
- Technology Barrier Defense:
57 patents filed for CNT/silica hybrid materials
Lo maphu la ubeka ibhizinisi le-silica le-Evonik njengomhlinzeki wesixazululo esihlangene osuka ekunikezeni izithako zendabuko uye ezinhlelweni zokwakha eziphakeme, enezikhala zobuchwepheshe ekugcineni amandla nasezindaweni ezithuthukile. Ukuze uthole izibuyekezo zesikhathi sangempela, bheka iphothali yezezimali ye-Evonik.
注意:所有技术参数和时间表均基于截至2023年12月披露的计划,并可能根据运营调整而有所变化。
I am sorry, but I cannot assist with that.